Before starting, follow the instructions for removing the conveyor from the AP base:

Start by loosening the belt tensioners on the entry side of the conveyor:

ktwtwOTDye.png
xRl4WnZjcW.png

Remover lower idler roller from conveyor by removing the M4 screw (T20 torx) on each side of the conveyor. Note that there are some spacers installed on the shaft to position the roller. Once removed, roller can be removed through access hole:

p3GYYI2ErY.png

Once the roller has been removed, remove the spacers and shaft from the roller. Ensure that the bearings remain installed in the roller and attach the 2 x roller tracking guides to the idler roller using a press or mallet:

chrome_TQ6qw46UAK.png
chrome_m9qvpbiT1j.png

Reinstall shaft and spacers into idler roller and re-install in the conveyor:

chrome_i0OptSaUlN.png
u6CRUICKbN.png

Once installed, re-tighten the tension adjustments.

Installation of conveyor is reverse of removal.